SW Sewage network
Structure first. Stages are optional — set batch count to 0 to save a structure only (or add stages later from Records). Each stage needs its own date. Measurement stages require a number (m). MH: Top Slab or Inclined — not both.
Structure first. Stages are optional — set batch count to 0 to save a structure only (or add stages later from Records). Each stage needs its own date. Measurement stages require a number (m). MH: Top Slab or Inclined — not both.
Description is built from the selected fields and must be unique (this is the duplicate rule when WIR Serial No is blank). Change stage, element, building, notes, or other fields that shape the description, then submit again.